Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Plastics piping systems for industrial applications — Polybutene (PB), polyethylene (PE), polyethylene of raised temperature resistance (PE-RT), crosslinked polyethylene (PE-X), polypropylene (PP) — Metric series for specifications for components and the system
30.60 Close of voting/ comment period
Road vehicles — Compressed natural gas (CNG) fuel systems — Part 1: Safety requirements
30.60 Close of voting/ comment period
Road vehicles — Compressed natural gas (CNG) fuel systems — Part 2: Test methods
30.60 Close of voting/ comment period
Fine-cut tobacco and smoking articles made from it — Methods of sampling, conditioning and analysis — Part 2: Atmosphere for conditioning and testing
30.20 CD study/ballot initiated
Petroleum and related products — Determination of chlorine and bromine content — Wavelength-dispersive X-ray fluorescence spectrometry
30.99 CD approved for registration as DIS
Specification and qualification of welding procedures for metallic materials — Welding procedure test — Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys
30.20 CD study/ballot initiated
Absorbent incontinence products for urine and/or faeces — General guidelines on evaluation
30.60 Close of voting/ comment period
Metallic materials — Method of test for the determination of quasistatic fracture toughness of welds
30.60 Close of voting/ comment period
Acoustics — Noise control design procedures for open plant
30.60 Close of voting/ comment period
Buildings and constructed assets — Service life planning — Part 1: Concepts, Principles and terminology
30.60 Close of voting/ comment period
Buildings and constructed assets — Service life planning — Part 2: Process considerations
30.60 Close of voting/ comment period
Buildings and constructed assets — Service life planning — Part 3: Methodologies, data and communication
30.60 Close of voting/ comment period
Plastic containers for intravenous injections
30.99 CD approved for registration as DIS
Seal-less rotodynamic pumps — Class II — Specification
30.99 CD approved for registration as DIS
Rubber compounding ingredients — Carbon black — Determination of aggregate size distribution by disc centrifuge photosedimentometry
30.60 Close of voting/ comment period
Washer-disinfectors — Part 6: Requirements and tests for washer-disinfectors employing thermal disinfection for noncritical medical devices and health care equipment
30.99 CD approved for registration as DIS
Indoor air — Part 3: Determination of formaldehyde and other carbonyl compounds in indoor air and test chamber air — Active sampling method
30.99 CD approved for registration as DIS
Condition monitoring and diagnostics of wind turbines — Part 1: General guidelines
30.99 CD approved for registration as DIS