Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Vegetable fats and oils — Determination of aflatoxins B1, B2, G1, G2 by immunoaffinity column clean-up and high-performance liquid chromatography
50.00 Final text received or FDIS registered for formal approval
Intelligent transport systems — Traffic and travel information (TTI) via transport protocol experts group, generation 2 (TPEG2) — Part 21: Geographic location referencing (TPEG-GLR)
50.00 Final text received or FDIS registered for formal approval
Intelligent transport systems — Traffic and travel information (TTI) via transport protocol experts group, generation 2 (TPEG2) — Part 25: Electromobility charging infrastructure (TPEG2-EMI)
50.00 Final text received or FDIS registered for formal approval
Security and resilience — Community resilience — Principles, framework and guidelines on urban resilience
50.00 Final text received or FDIS registered for formal approval
Ships and marine technology — Electronic port clearance (EPC) — Part 1: Message structures and application programming interfaces
50.00 Final text received or FDIS registered for formal approval
Anti-bribery management systems — Requirements with guidance for use
50.00 Final text received or FDIS registered for formal approval
Water meters for cold potable water and hot water — Part 4: Non-metrological requirements not covered in ISO 4064-1
50.00 Final text received or FDIS registered for formal approval
Water meters for cold potable water and hot water — Part 5: Installation requirements
50.00 Final text received or FDIS registered for formal approval
Animal and vegetable fats and oils — High-performance liquid chromatography (HPLC) analysis of phenolic antioxidants
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Electrically propelled road vehicles — Functional and safety requirements for power transfer between vehicle and external electric circuit — Part 4: Magnetic field wireless power transfer
50.00 Final text received or FDIS registered for formal approval
Chromium ores and concentrates — Determination of chromium content — Titrimetric method
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Lifts for the transport of persons and goods — Part 7: Accessibility to lifts for persons including persons with disability
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
ISO general purpose metric screw threads — Tolerances — Part 4: Limits of sizes for hot dip galvanized external threads to mate with internal threads made to tolerance position H or G after galvanizing
50.00 Final text received or FDIS registered for formal approval
ISO general purpose metric screw threads — Tolerances — Part 5: Limits of sizes for internal threads to mate with hot dip galvanized external threads with maximum size of tolerance position h before galvanizing
50.00 Final text received or FDIS registered for formal approval
Mechanical vibration and shock — Mechanical impedance of the human hand-arm system at the driving point
00.00 Proposal for new project received
Test method for assessing the performance of gas-phase air cleaning media and devices for general ventilation — Part 4: Classification system for GPACDs applied to treatment of indoor air
00.00 Proposal for new project received
Geometrical product specifications (GPS) — Drawing indications for moulded parts in technical product documentation (TPD)
00.00 Proposal for new project received
Technical product documentation — Vocabulary — Terms relating to technical drawings, product definition and related documentation
00.00 Proposal for new project received