Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Methods for the calibration of vibration and shock transducers — Part 46: Low-frequency calibration by machine vision systems
00.00 Proposal for new project received
Condition monitoring and diagnostics of wind turbines — Part 3: Tower and Foundation Monitoring
00.00 Proposal for new project received
Water quality — Analysis of microplastic in water — Part 4: Sample preparation for monitoring of microplastics for waters with low content of suspended solids including drinking water
00.00 Proposal for new project received
Cosmetics — Guidelines on technical definitions and criteria for natural and organic cosmetic ingredients — Part 2: Criteria for ingredients and products
00.00 Proposal for new project received
Microbiology of the food chain — Method validation — Part 1: Vocabulary
00.00 Proposal for new project received
Microbiology of the food chain — Method validation — Part 8: Protocol for the validation of alternative methods against a reference method for viruses or parasites
00.00 Proposal for new project received
Microbiology of the food chain – Method validation — Part 9: Protocol for the validation of alternative methods for preformed bacterial toxins and biogenic amines in food intended for human consumption
00.00 Proposal for new project received
Roadmap and Guidance for Façade Fire testing and Assessment
00.00 Proposal for new project received
Laboratory test of dust collection systems utilizing porous filter media online cleaned using pulses of compressed gas — Part 2: Systems not utilizing integrated fans
00.00 Proposal for new project received
Documents and processes in e-commerce — Smart contract-based B2B electronic transaction execution and verification — Part 1: Reference model
00.60 Close of review
Data and process of edible agricultural products based on blockchain and DLT application
00.00 Proposal for new project received
District heating and district cooling networks – Circulation water — Part 1: Water for district heating systems
00.00 Proposal for new project received
District heating and district cooling networks – Circulation water — Part 2: Water for district cooling systems
00.00 Proposal for new project received
Intelligent Corrosion Control Engineering Life Cycle — General Requirements
00.00 Proposal for new project received
Geometrical product specifications (GPS) — Filtration — Part 1: Overview and basic concepts
00.00 Proposal for new project received
Radiological protection — Monitoring and internal dosimetry for staff members exposed to medical radionuclides as unsealed sources
00.00 Proposal for new project received
Radiological protection — Monitoring and internal dosimetry for specific materials — Part 1: Inhalation of uranium compounds
00.00 Proposal for new project received
Surveillance of the activity concentrations of airborne radioactive substances in the workplace of nuclear facilities
00.00 Proposal for new project received