Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Preparation of steel substrates before application of paints and related products — Surface Preparation Methods — Part 6: Laser Cleaning
20.60 Close of comment period
Plastics — Determination of residual peroxide — Gas chromatography method
20.60 Close of comment period
Road vehicles — Fuse-links — Part 3: Fuse-links with tabs (blade type) Type C (medium), Type E (high current) and Type F (miniature)
20.60 Close of comment period
Injection-moulded unplasticized poly(vinyl chloride) (PVC-U) fittings for pressure pipe systems — Crushing test
20.20 Working draft (WD) study initiated
Contingency plan for infection prevention and control (IPC) in exhibition industry
20.60 Close of comment period
Gas cylinders — Identification of gas cylinder manufacturer marks and their assigned radio frequency identification (RFID) codes
20.60 Close of comment period
Fire safety — Statistical data collection — Part 1: Overview of national fire statistics practices
20.60 Close of comment period
Plastics — Use of polyethylene reference film (PERF) for monitoring laboratory and outdoor weathering conditions
20.60 Close of comment period
Graphic Technology — Method and procedures for predicting print image quality for prints from high-speed inkjet printing system
20.20 Working draft (WD) study initiated
Iron ores — Determination of sodium content by X-ray fluorescence spectrometry
20.60 Close of comment period
Space systems — Space batteries — Guidelines for in-flight health assessment of lithium-ion batteries
20.99 WD approved for registration as CD
Surface chemical analysis — scanning probe microscopy — Guideline for experimental quantification of carrier concentration in semiconductor devices by using electric scanning probe microscopy
20.99 WD approved for registration as CD
Road Tunnel Fire Safety — A general overview of regulatory frameworks and research
20.20 Working draft (WD) study initiated
Management of terminology resources — Companion to TermBase eXchange (TBX) — Part 2: RNG schema for TBX-Core
20.60 Close of comment period
Fire safety engineering — Performance of structures in fire — Part 4: Example of a fifteen-storey steel-framed office building
20.20 Working draft (WD) study initiated
Plastics - Low Temperature cracking index test of thermosetting resin based material – Embedded metal block method
20.20 Working draft (WD) study initiated