DPS
Drejtoria e Përgjithshme e Standardizimit
Phone: +355 4 222 62 55
E-mail: info@dps.gov.al
Address: Address: "Reshit Collaku" Str., (nearby ILDKPKI, VI floor), Po.Box 98, Tiranë - Albania
Main menu

prDS IEC TS 62786-3:2023 ED1

Distributed energy resources connection with the grid - Part 3: Additional requirements for stationary battery energy storage system

General information

40.60     May 10, 2024

50.99   

DPS

DPS/KT 3

Technical Specification

29.240.01  

Scope

IEC TS 62786-3:2023, which is a Technical Specification, provides principles and technical requirements for interconnection of distributed Battery Energy Storage System (BESS) to the distribution network. It applies to the design, operation and testing of BESS interconnected to distribution networks. It includes the additional requirements for BESS, such as connection scheme, choice of switchgear, normal operating range, immunity to disturbance, active power response to frequency deviation, reactive power response to voltage variations and voltage changes, EMC and power quality, interface protection, connection and start to generate electric power, active power management, monitoring, control and communication, and grid-connected tests.
The stationary BESSs considered within the scope of this document include electrical forms such as lead-acid, lithium-ion, liquid flow and sodium-sulfur batteries, interconnected to medium voltage (MV) or low voltage (LV) distribution networks via bidirectional DC to AC power converters. This document will specify active and reactive power response and grid-connected testing for distributed BESS, as a supplement for IEC TS 62786-1:2023.
This document specifies interface requirements for connection of distributed BESS with the distribution network operating at a nominal frequency of 50 Hz or 60 Hz.

Life cycle

NOW

IN_DEVELOPMENT
prDS IEC TS 62786-3:2023 ED1
40.60 Close of voting
May 10, 2024

Related project

Adopted from IEC TS 62786-3:2023 ED1

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.

Login