SSH EN 60229:2008

Kabllot elektrik - Prova mbi këllëfin e sipërm të ekstruduar me një funksion mbrojtës të veçantë

Electric cables - Tests on extruded oversheaths with a special protective function
12 dhj 2008

General information

60.60     1 jan 2008

DPS

DPS/KT 8

European Norm

29.060.20  

anglisht  

Buying

Publikuar

Language in which you want to receive the document.

Scope

Provides a range of tests which may be required for electric cables which have an extruded oversheath and where that oversheath performs a special protective function. The standard covers cables for use in insulated systems and in uninsulated systems. The tests are categorized for use as routine tests, type tests and tests after installation. These tests comprise of electrical routine tests on cable oversheath used in insulated or uninsulated systems, abrasion and corrosion spread type tests, electrical test on cable oversheath after installation. Routine tests and tests after installation, as specified in the relevant cable standards, are applicable for all situations. Type tests depend upon the nature of the system and the construction of the cable and do not have to be carried out for normal conditions of use. The significant technical changes with respect to the previous edition are as follows: - The text has been modified in order to consider the function of the oversheath, irrespective of the way the metallic sheath or screen of the cable is earthed because, in some cases, the oversheath is designed to act not only as a protection against corrosion, but also to reduce the risk of degradation of the cable insulation system. This requirement may be independent of the nature of the insulation and independent of the rated voltage of the cable. - More precise wording has been introduced regarding the application of some tests (if the sheaths or foils are bonded to the oversheath or not). - The test requirements have been revised in order to be in line with the standards published after the second edition. - The pressure test at high temperature has been deleted as the requirement is specified in the relevant cable standards. - A 'Guidance on tests after installation' (Annex B) has been included.

Life cycle

NOW

PUBLISHED
SSH EN 60229:2008
60.60 Standard published
1 jan 2008

Related project

Adopted from EN 60229:2008

Adopted from IEC 60229 Ed. 3.0 b

Preview

Only informative sections of projects are publicly available. To view the full content, you will need to members of the committee. If you are a member, please log in to your account by clicking on the "Log in" button.