Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Design using geosynthetics — Part 5: Stabilization
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Buildings and civil engineering works — Seismic resilience assessment and strategies — Compilation of relevant information
50.00 Final text received or FDIS registered for formal approval
Medical devices — Examples of the application of the risk management process to cardiac valve replacement and repair systems
50.00 Final text received or FDIS registered for formal approval
Financial services — Semantic technology — Part 2: OWL representation of the ISO 20022 metamodel and e-repository
50.00 Final text received or FDIS registered for formal approval
Application Guideline for use of RFID on Returnable Transport Items — Part 2: For Plastic RTIs
30.20 CD study/ballot initiated
Welding — Best practices for specification and measurement of ferrite in stainless steel weld metal
50.00 Final text received or FDIS registered for formal approval
Safety and environment information for biogas plants, biogas transportation and biogas use
50.92 FDIS or proof referred back to TC or SC
Traditional Chinese medicine — Priority list of single herbal medicines for developing standards
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Air quality — Guidance on the validation of air quality measurement methods in the standardization process
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Large outdoor fires and the built environment — Global overview of different approaches to standardization
50.00 Final text received or FDIS registered for formal approval
Information and documentation — Blockchain and distributed ledger technology (DLT) in relation to authoritative records, records systems and records management
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Visualization elements of digital twin — Visualization fidelity
50.00 Final text received or FDIS registered for formal approval
Examples of good practice for the management of assets of water supply and wastewater systems — Part 1: Part 1: Water supply
50.00 Final text received or FDIS registered for formal approval
Electronic fee collection – Image-based tolling systems – Measurable characteristics
50.00 Final text received or FDIS registered for formal approval
Lifts and escalators subject to seismic conditions — Compilation report — Part 1: Rule by rule comparison
30.99 CD approved for registration as DIS
Fans — Air curtain units — Part 3: Test methods to determine energy effectiveness
30.99 CD approved for registration as DIS
Carbon dioxide capture, transportation and geological storage — Carbon dioxide enhanced oil recovery (CO2-EOR) — Transitioning from EOR to storage
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Transaction assurance in E-commerce — After-sales services
50.00 Final text received or FDIS registered for formal approval