Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Good practice in reference material preparation
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Sharing economy – se cases of sharing economy platforms in the public sector
50.00 Final text received or FDIS registered for formal approval
Integrative design of the building envelope — General principles
50.92 FDIS or proof referred back to TC or SC
Railway applications — Rolling stock — Interior passive safety
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Intelligent transport systems — Seamless positioning for multimodal transportation in ITS stations — Part 1: General information and use case definition
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Railway infrastructure — Track quality evaluation — Chord-based method
50.00 Final text received or FDIS registered for formal approval
Sustainability in buildings and civil engineering works — Guidelines on the application of the general principles in ISO 15392
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Validation method for fire gas analysis — Part 3: Considerations related to interlaboratory trials
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Mechanical vibration — Ground-borne noise and vibration arising from rail systems — Part 34: Characterizing irregularity of the running surfaces with respect to vibration excitation
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Earth-moving machinery and mobile road construction machinery — Worksite data exchange — Part 4: Worksite topographical data
50.92 FDIS or proof referred back to TC or SC
Copper, lead and zinc sulfide concentrates — Step-by-step procedure for the testing of static scales
50.60 Close of voting. Proof returned by secretariat
Manufacturers’ considerations for in vitro diagnostic medical devices in a public health emergency
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Health informatics — Terminological resources — Part 3: Terminology implementation maturity model (TIMM)
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Patient compartment of negative pressure ambulance — Technical specifications
50.00 Final text received or FDIS registered for formal approval
Natural gas — Correlation between odorant concentration in air and odour intensity
50.92 FDIS or proof referred back to TC or SC
Footwear — Performance requirements for components for footwear — Accessories
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Footwear — Performance requirements for components for footwear — Outsoles
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Footwear — Performance requirements for components for footwear — Uppers
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks