Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Small craft — Liquefied petroleum gas (LPG) systems
50.00 Final text received or FDIS registered for formal approval
Ships and marine technology — Ship design — CNG and LNG propulsion system
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Design method for ductile iron pipes
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Offshore containers and associated lifting sets — Part 1: Design, manufacture and marking of offshore containers
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Offshore containers and associated lifting sets — Part 2: Design, manufacture and marking of lifting sets
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Offshore containers and associated lifting sets — Part 3: Periodic inspection, examination and testing
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Soil quality — Vocabulary
50.00 Final text received or FDIS registered for formal approval
Gas cylinders — Non-refillable metallic gas cylinders — Specification and test methods
50.00 Final text received or FDIS registered for formal approval
Sterilization of health care products — Radiation — Part 1: Requirements for the development, validation and routine control of a sterilization process for medical devices
50.00 Final text received or FDIS registered for formal approval
Transfusion equipment for medical use — Part 4: Transfusion sets for single use, gravity feed
50.00 Final text received or FDIS registered for formal approval
Transfusion equipment for medical use — Part 5: Transfusion sets for single use with pressure infusion apparatus
50.00 Final text received or FDIS registered for formal approval
Service excellence — Principles and model for public service organizations
50.00 Final text received or FDIS registered for formal approval
Unalloyed aluminium ingots for remelting — Classification and composition
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Gas welding equipment — Decomposition blockers for high-pressure acetylene
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Road vehicles — Safety glazing materials — Test methods for electro-switchable glazing
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
PPE for firefighters — Test methods and requirements for PPE used by firefighters who are at risk of exposure to high levels of heat and/or flame while fighting fires occurring in structures — Part 1: General
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Synchronous belt drives — Automotive belts — Determination of physical properties
50.00 Final text received or FDIS registered for formal approval
Plain bearings — Tolerances — Part 1: Fits
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks