Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Condition monitoring and diagnostics of machines — Requirements for training and certification of personnel — Part 3: Requirements for training bodies and the training process
50.00 Final text received or FDIS registered for formal approval
Internal combustion engines — Piston pins — Part 2: Inspection measuring principles
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Traditional Chinese medicine — Glycyrrhiza uralensis, Glycyrrhiza inflata, and Glycyrrhiza glabra root and rhizome
50.00 Final text received or FDIS registered for formal approval
Ophthalmic optics — Contact lens care products — Part 2: Method for evaluating disinfecting efficacy by contact lens care products using trophozoites of Acanthamoeba species as the challenge organisms
50.00 Final text received or FDIS registered for formal approval
Plastics — Polypropylene (PP) moulding and extrusion materials — Part 2: Preparation of test specimens and determination of properties
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Woodworking machines — Safety — Part 13: Multi-blade rip sawing machines with manual loading and/or unloading
50.00 Final text received or FDIS registered for formal approval
Woodworking machines — Safety — Part 15: Presses
50.00 Final text received or FDIS registered for formal approval
Geographic information — Positioning services
50.00 Final text received or FDIS registered for formal approval
Microbeam analysis — Analytical electron microscopy — Method of determination for apparent growth direction of wire-like crystals by transmission electron microscopy
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Performance requirements for standards on concrete structures
50.00 Final text received or FDIS registered for formal approval
Paints and varnishes — Determination of the film thickness of coatings using an ultrasonic gauge
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling — Part 6: Health and safety information
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Sampling and analysis of toxic gases and vapours in fire effluents using Fourier Transform Infrared (FTIR) spectroscopy
50.00 Final text received or FDIS registered for formal approval
Gaseous hydrogen — Fuelling stations — Part 2: Dispensers and dispensing systems
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Gaseous hydrogen — Thermally-activated pressure relief devices for compressed hydrogen vehicle fuel containers
50.00 Final text received or FDIS registered for formal approval
Oil and gas industries including lower carbon energy — Specific requirements for offshore structures — Part 4: Geotechnical design considerations
50.00 Final text received or FDIS registered for formal approval
Equipment for crop protection — Knapsack sprayers — Part 1: Safety and environmental requirements
50.00 Final text received or FDIS registered for formal approval
Equipment for crop protection — Knapsack sprayers — Part 2: Test methods
50.00 Final text received or FDIS registered for formal approval