Use the form below to find the searched projects. Enter your criteria for searching (single or in combination) in the fields below and press the button “Search”.
Equipment for crop protection — Knapsack sprayers — Part 3: Inspection of knapsack sprayers in use
50.00 Final text received or FDIS registered for formal approval
Textile floor coverings — Water impermeability test
50.00 Final text received or FDIS registered for formal approval
Microbeam analysis — Analytical electron microscopy — Method for the determination of interface position in the cross-sectional image of the layered materials
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Coal and coke — Determination of total sulfur by Coulomb titration method
50.00 Final text received or FDIS registered for formal approval
Mobile road construction machinery — Safety — Part 1: Common requirements
50.00 Final text received or FDIS registered for formal approval
Mobile road construction machinery — Safety — Part 2: Specific requirements for road-milling machines
50.00 Final text received or FDIS registered for formal approval
Mobile road construction machinery — Safety — Part 3: Specific requirements for soil-stabilising machines and recycling machines
50.00 Final text received or FDIS registered for formal approval
Mobile road construction machinery — Safety — Part 4: Specific requirements for compaction machines
50.00 Final text received or FDIS registered for formal approval
Mobile road construction machinery — Safety — Part 5: Specific requirements for paver-finishers
50.00 Final text received or FDIS registered for formal approval
Mobile road construction machinery — Safety — Part 6: Specific requirements for mobile feeders
50.00 Final text received or FDIS registered for formal approval
Mobile road construction machinery — Safety — Part 7: Specific requirements for slipform pavers and related machines
50.00 Final text received or FDIS registered for formal approval
Radiation protection — Monitoring of workers occupationally exposed to a risk of internal contamination with radioactive material
50.00 Final text received or FDIS registered for formal approval
Manually portable (hand-held) powered lawn and garden equipment and forest machinery — Engine performance and fuel consumption
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Wrought aluminium and aluminium alloys — Chemical composition
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Stationary training equipment — Part 1: General safety requirements and test methods
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Plastics piping systems for industrial applications — Unplasticized Polyamide (PA-U) — Metric series for specifications for components and system
50.00 Final text received or FDIS registered for formal approval
Plastics — Polymer polyols for use in the production of polyurethanes — Determination of the residual acrylonitrile and styrene monomer content by gas chromatography
50.20 Proof sent to secretariat or FDIS ballot initiated: 8 weeks
Specification and requirements of thermal spray coatings for power plant boiler tubes
50.00 Final text received or FDIS registered for formal approval